Approximately 1 hour
Based on published studies, a vented rainscreen assembly provides the following for a wall assembly:
• Effectively drain water that has entered behind the cladding
• Reduces the wet time of absorptive claddings
• Increased drying of the interstitial wall assembly
• Mitigate reverse vapor drive for highly permeable Water Resistant Barrier / Air Barrier (WRB/AB) systems
Learn the current research and field practices on vapor open (permeable), vented rain screen cladding wall assemblies and their impact to mitigate water long-term intrusion and enhance the drying capacity of the building envelope assembly for the life of the building.
Presented by various experts on behalf of VaproShield LLC.
Date & Time | Location | Contact | |
---|---|---|---|
Thursday, May 23, 2024 at 13:00 EDT (UTC-04:00) | Webinar | Carol Danhof |
You can REQUEST a live event at a convenient time and location for you.
Log in or Create an account to ask the sponsor a question about this course!
This course is delivered LIVE. It's presented through face-to-face and/or webinar event(s).
This course is ACTIVELY registered with 2 industry association(s). Show CURRENT course approvals
This course IS NOT Health, Safety and Welfare eligible.
You can review the privacy policy that applies to this course: VaproShield LLC Privacy Policy